Multiple Choice
If the net present value for a project is zero or positive, this means
a. the project should be accepted.
b. the project should not be accepted.
c. the expected rate of return is below the required rate of return.
d. both (a) and (c).
Click here for the SOLUTION
No comments:
Post a Comment